Northwest Cape Coral Parks Update

Sirenia Vista

Prefab toilets

You may have noticed a lot of construction preparation at the park in addition to the dredging of the spreader canal that was recently completed.

The city is in the process of adding several improvements to the park.  One of the main improvements will be the construction of permanent restrooms (see example).  The restrooms will be located near the observation platform and book exchange.  The area around the restrooms will be landscaped and they will be accessible with sidewalks.

Proposed Basins

Proposed Basins (1)_Page_1 straightProposed Basins (1)_Page_2 straight

The city will be improving the landscaping, install irrigation, and reinforce the canal banks from erosion.  Three storm retention basins will be built to improve drainage and eliminate the standing water that occurs after heavy rains.  There will be a storm retention basin will be located in the area behind the current portable restrooms.  There will be another retention basin located between the sidewalks just north of the picnic pavilion.  Another storm retention basin will be built behind the new restrooms.

The entrance from southbound Old Burnt Store Rd will be permanently closed off.  All the improvements are expected to be completed by the end of February.  The park will remain open during the construction.

Tropicana Park

Tropicana Park - Birds Eye View

The site plan has been finalized and the city is now just waiting on the Federal permit from the Army Corp of Engineers.  As soon as the city receives the permit, they can set the construction timeline.

Tropicana Park Final Site Plan

Crystal Lake

The site plan has been finalized and the city is now waiting on the Federal permit from the Army Corp of Engineers.  As soon as the city receives the permit, they can set the construction timeline.

Crystal Lake Park Final Site PlanCrystal Lake - Bird's Eye View

Festival Park

The final site plan is approved and construction of phase 1 is tentatively scheduled to begin in December.  Some of the amenities in Phase 1 construction will include parking lots, an amphitheater, concession, restrooms, soccer fields, and a large pavilion.

Park concept drawing

Previous
Previous

City of Cape Coral Candidates for Mayor & City Council - Election 2022

Next
Next

Cape Coral, Fl Truth in Millage (TRIM) Update